Re: tunnel clearances
Reply #3 –
Yahoo Message Number: 87271
Bill,
We have traveled the full length of the Blue Ridge Parkway in a Wanderlodge we used to own. The tunnel heights are, I think, based on the road edge height rather than the road middle. All of the tunnels are arched. Some made me very nervous but we never made contact.
The overhanging tree growth is another matter. Much contact with that. Particularly with the CB antenna.
I'm not going to make the trip again.
George in Birmingham
'03 Magna 6298